24/7 Emergency Service — burst pipes, water heater failure, sewer backup. We answer the phone.Call (919) 555-8821
Home/Projects
Recent Projects · 2023–2026

A few jobs we're proud of.

Real projects from real customers across Durham, Chapel Hill, and the Triangle. We're happy to share customer references on request — just ask when you call.

Modern bathroom with new fixtures in a Hillsborough custom home.
New ConstructionHillsborough · 2026

4,800 sq ft custom home rough-in

Type L copper manifold, 11 fixtures, Rinnai RU199iN tankless, hot-water recirculation, basement utility stub. Passed inspection first pass.

Restored 1923 bungalow bathroom with new copper supply.
Whole-Home RepipeOld West Durham · 2025

1920s bungalow polybutylene swap

80 years of galvanized and polybutylene replaced with Type L copper. Three days on site, no damage to original trim work.

Commercial restaurant kitchen with three-bay sink and grease trap.
CommercialCarrboro · 2025

Restaurant kitchen rough-in

750-gallon Schier grease interceptor, three-compartment prep sink, mop sink, hand-wash, code-compliant venting. Health Dept approved first pass.

A new copper manifold install in a Triangle-area home mechanical room.
Repipe + TanklessChapel Hill · 2025

Chapel Hill ranch — full repipe

2,400 sq ft ranch. Removed polybutylene, installed Uponor PEX-A manifold, Rinnai RU180iN tankless with recirc loop, new PRV. Done in 4 days.

A primary bath remodel with new Moen fixtures and tile work.
Bath RemodelWatts-Hillandale · 2024

Primary bath plumbing rough & trim

New Moen Voss fixtures, TOTO Drake II toilet, freestanding tub valve rough, in-wall carriers, and rerouted vent to clear the new vanity location.

A tankless water heater install on an exterior wall.
Tankless ConversionForest Hills · 2024

Rinnai tankless conversion

Replaced dual 50-gallon tanks with a single Rinnai RU199iN. Resized the gas line, ran new concentric venting, added recirc pump.

Trenchless sewer-line replacement equipment staged on a Durham lawn.
Trenchless SewerTrinity Park · 2024

Sewer line — pipe-bursting

90 feet of 4-inch clay sewer replaced with HDPE via pipe-bursting. Two days on site, two small access pits, lawn fully restored.

An ADU mechanical room with PEX-A manifold.
New ConstructionCleveland-Holloway · 2023

800 sq ft ADU rough-in

Detached accessory dwelling unit. Separate 1-inch water service, on-demand recirc, gas service for range & tankless water heater.

Got a Project?

Let's make yours the next one.